Home / Solutions / Connected city / EV Charging Infrastructure

Connected city

EV Charging Infrastructure

Chargers, power and software planned together, so drivers find a working bay and operators stay in control.

Overview

What this solution delivers.

A charger is the visible part of a larger system. Behind it are the power supply, the load on the building, the network connection, the payment method and the question every driver asks: is a bay free and working?

We design charging as part of the site. Charger types matched to how long vehicles stay, power shared sensibly between them, a management platform for monitoring and billing, and bay availability shown through the parking guidance system.

Typically for: car park and property owners, developers, municipalities, fleet operators and consultants planning charging facilities.

At a glance

Every part of the system, in one picture.

Select a label to see what each device does. The 3D model below follows the system step by step.

Cutaway illustration of EV Charging Infrastructure

Select a label

EV Charging Infrastructure

Every labelled part of the drawing is a device the system connects. Select one to see what it does.

Illustration. Generic equipment, not a specific home, site or product.

How it works

Follow the system, step by step.

Select a numbered point or a step. Drag the model to look around.

Drag to rotate · pinch or use + and − to zoom

Illustrative model. Generic equipment, not a specific site.

1 / 3

Challenges

What typically goes wrong.

01

Limited power

The existing supply cannot feed every charger at full output at once.

02

Blocked bays

Charging bays are taken by vehicles that are not charging.

03

Faults found by drivers

An operator learns a charger is down only when someone complains.

04

Separate systems

Charging, parking and payment each have their own application and account.

What we offer

What the scope can include.

Each project is scoped to its site. These are the parts we design, supply, integrate and maintain.

  • Demand study and site power assessment
  • Slow and fast chargers matched to dwell time
  • Electrical supply, protection and metering
  • Load management across groups of chargers
  • Charging management platform with monitoring and billing
  • Charger and bay availability shown through parking guidance and parking management
  • Bay sensors, signs and road markings
  • Integration with payment and building systems

Technology categoriesCommunication & networkingSoftware & platforms

Benefits

What changes for the people who run the site.

Power used sensibly

Load management is designed to serve more chargers from the supply available.

Bays drivers can find

Availability is shown before the driver reaches the bay.

Faults seen early

The operator is alerted when a charger goes offline.

One operating picture

Charging sits alongside parking in the same management view.

Questions

Common questions.

Is the existing power supply enough?

That is the first thing to check. A site power assessment shows what can be connected now, what load management can add, and where an upgrade would be needed.

Which make of equipment do you use?

Equipment is selected against the project specification and confirmed at design stage.

Discuss EV charging infrastructure for your site.

The request opens with this solution already selected.

Request a quotation